St. Michaels Hospital

Annex Boilerhouse equipment upgrade 2015.

The works were undertaken in late 2014 and early 2015 consisted of the following elements:

  • Removal of the old central heating boilers and replacement with new boilers.
  • Separation of the heating system serving the theatre air handling unit which involved installing two new wall-hung boilers.
  • Installation of a stand-alone domestic hot water system which involved the installation of two new wall-hung boilers.
  • Reconfiguration of the hot and cold water systems in order to allow the hot and cold water in the building to be pressurised (boosted).
  • Upgrade of the controls of the system.